Chinese Professional Clear Coat Rust Protection - 18 Meters Double Combustion Curing Furnace For Zinc Flake Coating FGG1812 – Junhe Detail:
Minimum Order Quantity:1 Set
Packaging Details:40 HQ
Delivery Time: Two months after receipt of advance payment
Supply Ability:2 Sets per Month
Color: Silvery
Inside Dimension: 18m*12m*0.3m
Heating Capacity: 100000+450000kcal/h
Max Curing Temperature: 350℃
Temperature Uniformity Control: ±5℃
Avg.heating Up Time: 30min
Max Load Capacity/mesh-belt: 300kg/㎡
Max Output: 10000kg/h
Description
1. Technological process:
Loading→Leveling→Drying(Pre-heating)→Curing→Cooling and unloading
2. Main structure:
Mainly structured of Loading and uncloading sections , HL Cooling System,Convey Unit,Body, Hot Blast Air Generating and Circulating Systems, Electric Control System and so on. High-automaticly controlled with the speed of mesh-blet regulated,it can fully satisfy all curing processes.

Technical Data
| Outsiade dimension | 23×15.9×16.6 | m |
| Inside dimension | 18×12×0.3 | m |
| Max curing temperature | 350 | ℃ |
| Temperature uniformity control | ±5 | ℃ |
| Max load capacity/mesh-belt | 300 | kg/m² |
| Avg.gas consumption | 28 | m³/h |
| Max output | 10000 | kg/h |
| Belt convey speed | 0.3~0.67 | m/min |
Product detail pictures:
Related Product Guide:
Our goods are commonly recognized and reliable by consumers and may satisfy continually developing economic and social needs for Chinese Professional Clear Coat Rust Protection - 18 Meters Double Combustion Curing Furnace For Zinc Flake Coating FGG1812 – Junhe , The product will supply to all over the world, such as: Norway, Florence, Dubai, Over the years, with high-quality solutions, first- class service, ultra-low prices we win thee trust and favor of customers. Nowadays our products sell all over the domestic and abroad. Thanks for the regular and new customers support. We offer high quality product and competitive price, welcome the regular and new customers cooperate with us!
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.



